<?xml version="1.0" encoding="UTF-8" ?>
<modsCollection xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns="http://www.loc.gov/mods/v3" xmlns:slims="http://slims.web.id" xsi:schemaLocation="http://www.loc.gov/mods/v3 http://www.loc.gov/standards/mods/v3/mods-3-3.xsd">
<mods version="3.3" id="47418">
 <titleInfo>
  <title></title>
 </titleInfo>
 <name type="Personal Name" authority="">
  <namePart>Akbar, Epsilon Analisa</namePart>
  <role>
   <roleTerm type="text">Primary Author</roleTerm>
  </role>
 </name>
 <typeOfResource manuscript="no" collection="yes">mixed material</typeOfResource>
 <genre authority="marcgt">bibliography</genre>
 <originInfo>
  <place>
   <placeTerm type="text">Bandung</placeTerm>
   <publisher>Magister Statistika Terapan</publisher>
   <dateIssued>2015</dateIssued>
  </place>
 </originInfo>
 <language>
  <languageTerm type="code">id</languageTerm>
  <languageTerm type="text">Indonesia</languageTerm>
 </language>
 <physicalDescription>
  <form authority="gmd"></form>
  <extent>xiii, 55 hlm. ; il. ; 29 cm</extent>
 </physicalDescription>
 <note>Metode optimisasi robust merupakan metode yang digunakan untuk &#13;
gani masalah-masalah yang berkaitan dengan ketidakpastian. Model ini &#13;
bahas masalah pengendalian persediaan dengan asumsi data permintaan yang &#13;
tu. Model robust memberikan hasil yang berbeda dengan model Economic &#13;
&#13;
yimpanan dan kekurangan pada setiap periode. Dari hasil perhitungan &#13;
. isasi robust juga menghasilkan total biaya yang lebih rendah dibanding &#13;
&#13;
Abstract &#13;
&#13;
Robust Optimization is the method used for handling matters relating to &#13;
tile uncertainty. This model discuss with the assumption of inventory control in &#13;
diJta uncertainty demand. Give a robust model different quantity with a model &#13;
economic order because it gives a model of robust estimates the cost of storage &#13;
and a shortage at any period. From the calculation of robust optimization also &#13;
gIVes much lower than the total cost EOQ model.</note>
 <note type="statement of responsibility">Akbar, Epsilon Analisa</note>
 <subject authority="">
  <topic>Optimisasi   2. Robust  3.EOQ</topic>
 </subject>
 <classification>610.73 Akb M</classification>
 <identifier type="isbn"></identifier>
 <location>
  <physicalLocation>Perpustakaan Universitas Padjadjaran Kementerian Riset Teknologi dan Pendidikan Tinggi</physicalLocation>
  <shelfLocator>610.73 Akb M/R.14.185</shelfLocator>
  <holdingSimple>
   <copyInformation>
    <numerationAndChronology type="1">01001150700053</numerationAndChronology>
    <sublocation>Perpustakaan Pusat (REF.14.185)</sublocation>
    <shelfLocator>610.73 Akb M</shelfLocator>
   </copyInformation>
  </holdingSimple>
 </location>
 <slims:image>20%252Fscan0001.jpg.jpg</slims:image>
 <recordInfo>
  <recordIdentifier>47418</recordIdentifier>
  <recordCreationDate encoding="w3cdtf">2017-04-02 04:36:52</recordCreationDate>
  <recordChangeDate encoding="w3cdtf">2018-07-04 08:22:35</recordChangeDate>
  <recordOrigin>machine generated</recordOrigin>
 </recordInfo>
</mods>
</modsCollection>